Mostrar el registro sencillo del ítem
Ingeniería a planta de osmosis inversa
dc.contributor.advisor | Reimondez, Martín | |
dc.coverage.spatial | Puerto Pirámides | es_ES |
dc.creator | Marín, Agustín | |
dc.date.accessioned | 2023-12-27T15:48:04Z | |
dc.date.available | 2023-12-27T15:48:04Z | |
dc.date.issued | 2023-12 | |
dc.identifier.uri | http://hdl.handle.net/20.500.12272/9370 | |
dc.description.abstract | El desarrollo del presente Proyecto de Ingeniería Electromecánica surgió de la necesidad de ampliar el nivel de producción de la planta de Osmosis inversa (Desalinizadora) ubicada en la comunidad de Pto. Pirámides en la región de la Península Valdés, provincia de Chubut Arg; además de la búsqueda del aumento de eficiencia, seguridad a través del seguimiento y control de la misma. Lo anterior con el fin de satisfacer una oferta adecuada tanto como en cantidad como en calidad,de oferta de agua potable así como para el consumo de la comunidad que permanece habitado a lo largo del año como también para brindar las condiciones básicas para desarrollar al turismo ocioso y al turismo científico En primera instancia se ha realizado una investigación preliminar en donde se ha coordinado y consultado personalmente con distintos agentes que intervienen en el proceso productivo así como la “Subsecretaria de Servicios Públicos” de la provincia de Chubut y la empresa “Servicoop” encargada de la operación de la planta. Así también para el asesoramiento se ha recurrido a la consulta de grupos de investigación como el grupo GEMYS operando en la UTN FRCH. Durante esta investigación se ha visitado la planta de ósmosis inversa en cuestión y áreas de influencias en donde se ha relevado los equipos, instrumental y las instalaciones. Se ha recopilado datos e información acerca del funcionamiento y la producción de la planta y se ha realizado el análisis de la misma para determinar el mejor plan de mejoras en base a la seguridad y a la rentabilidad. Prosiguiendo con la información recolectada se ha decidido determinar el desarrollo de un plan de distintas mejoras como: La implementación de bombas de pozo para la captación de agua a tratar, el rediseño de las instalaciones eléctricas y su correcta ubicación, instalación de instrumental de control, sensores para un monitoreo integral del proceso y control del funcionamiento de los equipos. como así también la implementación de energías limpias a través de paneles fotovoltaicos para abastecer de energía la planta de bombeo. En resumen, esta tesis representa un viaje a través de la ciencia, la ingeniería y la innovación que tienen el poder de transformar no solo la disponibilidad de agua potable, sino también la perspectiva de una comunidad hacia un futuro más prometedor y sostenible. | es_ES |
dc.description.abstract | The development of this Electromechanical Engineering Project arose from the need to expand the production capacity of the Reverse Osmosis plant (Desalination) located in the community of Pto. Pirámides in the Península Valdés region, Chubut Province, Argentina; as well as the pursuit of increased efficiency, safety through its monitoring and control. The aforementioned aims to meet an appropriate supply of both quantity and quality of drinking water, for the consumption of the community that remains inhabited throughout the year, as well as to provide the basic conditions for leisure tourism and scientific tourism development. In the first instance, a preliminary investigation has been conducted, where personal coordination and consultation has taken place with various stakeholders involved in the production process. This includes the 'Subsecretary of Public Services' of the Chubut Province and the company 'Servicoop,' responsible for the plant's operation. Additionally, for guidance, consultation has been sought from research groups such as the GEMYS group operating at UTN FRCH. During this investigation, the reverse osmosis plant in question and its surrounding areas were visited, where equipment, instruments, and facilities were surveyed. Data and information regarding the operation and production of the plant were collected, and an analysis of the same was conducted to determine the best improvement plan based on safety and profitability. Continuing with the gathered information, it has been decided to determine the development of a plan for various improvements, including the implementation of well pumps for water intake, the redesign of electrical installations and their proper placement, installation of control instruments, sensors for comprehensive process monitoring, and equipment operation control. Additionally, the implementation of clean energy through photovoltaic panels to power the pumping plant is planned. In summary, this thesis represents a journey through science, engineering, and innovation that has the power to transform not only the availability of drinking water but also a community's perspective toward a more promising and sustainable future. | es_ES |
dc.format | plain | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Universidad Tecnológica Nacional. Facultad Regional Chubut | es_ES |
dc.rights | openAccess | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.rights.uri | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
dc.subject | Osmosis inversa | es_ES |
dc.subject | Bombeo | es_ES |
dc.subject | Pozo | es_ES |
dc.subject | Desalinizadora | es_ES |
dc.title | Ingeniería a planta de osmosis inversa | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.description.affiliation | Fil: Marín, Agustín. Universidad Tecnológica Nacional. Facultad Regional Chubut. Ingeniería Electromecánica; Argentina. | es_ES |
dc.type.version | acceptedVersion | es_ES |
dc.contributor.coadvisor | Grondona, Facundo | |
dc.contributor.coadvisor | Rueda, Omar | es_ES |
dc.rights.use | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | es_ES |